Project scope includes the expansion of the existing UPOV with a capacity of 8,000 ES and the current II. purification stage to a final capacity of 16,000 ES is III. degree of treatment with the…

Year
2022
Sector
Infrastructure
Location
Croatia

Project scope includes the expansion of the existing UPOV with a capacity of 8,000 ES and the current II. purification stage to a final capacity of 16,000 ES is III. degree of treatment with the construction of a plant for solar drying of sludge from the waste water treatment process.

The works are contracted according to the terms of the contract for installation sand design and construction for electrical and mechanical buildings and works according to the Contractor’s projects (FIDIC Yellow Book)